Text Box: Following is a general listing of some key projects our company has completed.  These projects illustrates the various skills that CC & G can provide to your company.
Text Box: CC & G removed all the transformers both inside the plant and out in the switchyard under separate contracts in addition to removing contaminated soils from hard to get to areas in preparation for the new marina district.
Text Box: CC & G dismantled an abandoned railroad truss bridge and a girder bridge that was suspended over two active main line railroad lines on time, within budget and to the complete satisfaction of the serving railroad.
Text Box: CC & G remediated a 22 acre site which required removal of over 20,000 truck and car tires for recycle, other asbestos containing materials and all types of miscellaneous debris for both recycling  and off site disposal.
Text Box: CC & G performed all abatement tasks which included but not limited to asbestos abatement, decontamination of structures exposed to lead & cadmium & removal of all structures and equipment.
Text Box: CC & G replaced 1500 railroad ties throughout the yard and tamped the respective track work to bring the facility back into good operating order as it relates to RR Car Movement & Off Loading.

Toledo Edison - Acme Plant Decontamination

University of Toledo -  N. Engineering Hazardous                             Materials Abatement

City of Napoleon - Scrap Tires, Asbestos Containing Material & Misc. Surface Debris Removal and Disposal

Norfolk Southern - Bridge(s) Dismantlement

Transflo - Upgrade Industrial Rail Yard